Services
Automation and industrial data services
PLC programming, SCADA, telemetry, analytics, reporting and panel building. One team from the P&ID and control philosophy through FAT, SAT and handover documentation.
How we deliver a project
Most projects start with what you already have: a P&ID, an IO list, a drawing set, a control philosophy, or the report operations still builds in Excel. We scope the work before we quote it.
01
Scope
P&ID, IO list, control philosophy, or the Excel pack operations still builds.
02
Design
Drawings, panel spec, naming, and the change window the plant can actually give you.
03
Build
Panel assembly where the job needs one. PLC and SCADA software in parallel.
04
Prove
FAT, then SAT on the outage you have, with a rollback path.
05
Hand over
As-builts, operator notes, and remote support if you want it afterwards.
Automation
A live plant, a PLC nobody fully documented, and a change window measured in hours.
We programme Siemens, Schneider or Allen-Bradley, commission on the outage you have, and leave as-builts the next shift can run.
Learn moreTelemetry & IIoT
Remote pumps and reservoirs that drop off the radio for hours.
OPC-UA or MQTT through a gateway that buffers on link loss. Control stays in the PLC. The gap fills itself when the link returns.
Learn moreAnalytics & Dashboards
A SCADA screen with every tag, and still no answer to whether this train is behaving.
Dashboards built from the decisions the shift already has to make, not from every available tag.
Learn moreReporting
Month-end still means copying numbers from SCADA into a spreadsheet.
Scheduled packs from plant and lab data, with gaps flagged. Water reporting aligned to SANS 241. We build the workflow; we do not replace the compliance officer.
Learn morePanel Building
A panel that has to match the plant standard, not a catalogue layout.
Drawings, assembly, FAT, installation and as-builts as part of the same automation job, not a separate hardware order.
Learn moreHistorian
TDengine Historian
The SCADA archive only holds the last shift.
Evaluate, pilot and put TDengine TSDB + IDMP into production. Greenfield, a replacement, or beside the historian you already run.
Learn moreLet’s scope your control or telemetry project
Share the IO list, the panel specification, or the report pack that is still a spreadsheet. We will review the requirements and propose an approach.
